Hi guys, there’s not much time left till the competition and -as you can see – the construction works are going on well! PV cells set up on the roof and summer wall (vertical solar cells), and the guys are  installing the beautifully painted wooden facade panels; also the special, LED-lit suspended ceiling will be ready these days. During the construction works circulation and automation tests are going on. Next week we start disassembling.

Photos: Balázs Danyi

IMG 8578 The construction will be completed soon

motivational posters and picture gallery at the construction hall

IMG 8585 The construction will be completed soon

Thermofloc is quite cosy for the tired ones

IMG 8596 The construction will be completed soon

Installing the wooden facade panels

IMG 8600 The construction will be completed soon

IMG 8640 The construction will be completed soon

Vertical solar panels on the